YardageKit

How much concrete for steps?

Each step is a block that goes down to the ground. Add them up.

Stair calculator →

The formula

Solid steps on the ground are a stack of blocks: the first step runs the full height of one rise, the second two rises, and so on. Each block is width × tread depth × its height.

An example

Three steps up to a porch, 4 ft wide, with 11 in treads and 7 in rises: the porch is the fourth rise, so the total rise is 28 in. 4 × 0.917 × 0.583 × 6 = 12.8 cubic feet, or 0.48 cubic yards. That is 22 bags of 80 lb, or 24 with 10% extra.

Fill the bottom of large steps with clean rubble or gravel to save concrete. The stair calculator works out the risers and treads and, with the width, the concrete for solid steps; the concrete calculator covers the landing.

FAQ

How thick should concrete steps be?

Solid steps are filled to the ground; a landing slab is usually 4 to 6 in thick.

What rise and tread for concrete steps?

About 7 in rise and 11 in tread are common; codes usually cap the rise at 7.75 in.

Related calculators

More guides